14-56 Beach Channel Dr, Far Rockaway, NY 11691
Redfern Houses
This Redfern Sandy Recovery and Resiliency project includes construction work at all 9 buildings which includes installation renovation of playgrounds and lighting, structural reinforcement, flood protection, a new resilient building that will house a community center, childcare center, and new electrical, heat and hot water systems, as well as full back-up emergency power generators. Akcel Systems is providing automatic temperature controls for several systems for this project. Project includes controls Roof Top Units, Heat Exchangers, Central Steam Heating Plant, Makeup Air Units, Heating Hot Water Systems, VAV Boxes, etc.
80-45 Winchester Blvd, Queens Village, NY 11427
Bernard Fineson DDSO
Bernard Fineson Developmental Disabilities Services is located in Queens Village, NY. Akcel Systems has provided Automatic Temperature Controls for this project. Project includes controls Air Handling Units, Fans, Zone Controls, Boilers etc.
3003 West 21st Street, Coney Island, NY
3003 West 21st Street
Surf Vets Place will be a newly constructed 9-story mixed-use development with 53 one-, two-, and three-bedroom affordable housing units, 82 studio apartments reserved for and supporting homeless veterans, and 7,000 square feet of retail space. Embracing the Coney Island atmosphere, the ground level retail is designed to engage pedestrian traffic with large show windows. Akcel Systems is providing automatic temperature controls for several systems for this project. Project includes controls for hot water system, roof top units, zone controls, etc.
3020 Surf Ave, Brooklyn, NY 11224
Coney Island Houses
Coney Island Houses is so close to the ocean that it shares one side with the boardwalk. This construction project scope includes: full roof replacement; restoration of damaged playgrounds, surfaces, and fencing; replacement of underground conduits and site lighting; stairwell lighting; replacement of flooded mechanical and electrical. Akcel Systems is providing technical services for implementation of several control systems. Control Systems to includes Central Steam Heating Plant, Heat Exchanger, Fuel Oil System, Fans, etc.
Brooklyn, New York
Redhook Houses
NYCHA Redhook development has 28 buildings and house over 6,000 people. This project includes renovations in all 28 buildings and has two freestanding buildings central plants that incorporate community amenities in their design. The West Plant features a planted roof, acting as a continuation of the adjacent public park, while the East Plant includes social spaces in addition to a translucent exterior. There are fourteen “utility pods” which provide heat and electricity to the buildings. Akcel Systems is providing Building Automation System and Central Monitoring for all 28 Buildings, Utility PODs and Central Plants. Project includes controls for High Temperature Hot Water Generators, Unfired Steam Generators in PODs and Plants, Medium Temperature Hot Water System, Air Handling Units, Generators and Fuel Oil Systems, Steam Zone Controls, Development Wide BMS Fiber etc.
Manhattan, New York
Isaac Houses
Located between 93rd and 95th Streets, the Isaacs Houses include three 24-story buildings and contain 635 apartments. Akcel Systems is providing automatic temperature controls for several systems for this project. Project includes controls Zone Controls, Fan Controls Heating Systems, etc.
54 Avenue D, New York, NY 10009
NYCHA Lilian Wald Houses
This project is Sandy recovery work across the 18-building Lillian Wald Houses in Manhattan’s Lower East Side. Scope of work includes roof replacements, installation of generators and floodwalls, as well as site-wide improvements, including upgraded playgrounds and recreational areas. Akcel Systems is providing automatic temperature controls for several systems for this project. Project includes controls Zone Controls, Fan Controls Heating Systems, etc.
89-17 SUTPHIN BLVD, QUEENS, NY 11435
Queens County Civil Court
Akcel Systems has provided building management system for this project. Project includes controls for Chilled Water System which includes three chillers, three-chilled water pumps. Controls for Condenser water systems, which include Two Cooling Towers. Controls for Existing Exhaust Fan interlocked with CO Detection System. We also implemented required custom sequences to reduce energy consumption of the facility.